Northwest BC Industries The new gas treatment plant at the Rio Tinto modernized aluminum smelter had an art deco look. Media tour, July 7, 2015. Rio Tinto BC Operations Manager Gaby Poirier addresses the aluminum smelter First Metal Ceremony in Kitimat, July 7, 2015 Kitimat mayor Phil Germuth signs the new ingot as Phil Newsome, Bechtel and Michel Charron, Rio Tinto, watch during the Kitimat Modernization First Metal Ceremony, July 7, 2015. Construction workers putting the finishing touch's on the new gas treatment plant at the modernized Rio Tinto Aluminum smelter, July 7, 2015. Construction workers putting the finishing touchs on the new gas treatment plant at the Rio Tinto Kitimat aluminum smelter. July 7, 2015. Final construction at the new Rio Tinto aluminum smelter potlines, July 7, 2015. Ledcor heavy equipment works on the construction of the Bish Cove Road project. Oct. 31, 2014. A Ledcor grader works on the construction of the Bish Cove Road project, Oct. 31, 2014. An excavator works on the construction of the Bish Cove project. Oct. 31, 2104.. An excavator works on the Chevron-led Kitimat LNG site at Bish Cove, Oct. 5, 2014. An excavator works on the Chevron-led Kitimat LNG site at Bish Cove, Oct. 5, 2014. An intermodal container train enters the CN yards at Terrace, BC, passing a westbound coal train, during a rainstorm, July 18, 2011. (Robin Rowland) A 179-unit intermodal container train enters the CN yards at Terrace, BC, as the sun sets, July 11, 2011. The eastbound train was loaded with containers at the port of Prince Rupert, which is a major gateway for North America .(Robin Rowland) CEO Andy Caloz outlines the LNG Canada project for the directors of the Industrial Training Association, Sept. 25, 2014. CEO Andy Caloz outlines the LNG Canada project for the directors of the Industrial Training Association, Sept. 25, 2014. Future electrician apprentices meet their mentors at an Industrial Training Association meeting in Terrace Jan. 20, 2014. Future apprentices meet their mentors at an Industrial Training Association meeting in Terrace Jan. 20, 2014. Apprentice Jonah Preston works on a car at Kalum Tire Service in Terrace. BC, June 19 2014 Chef Randy Chalifoux teaches apprentices Edna Tait and Tell White at Mumford's Terrace, June 19, 2014. BC's Mobile Medical Unit (a portable emergency room) is seen in Kitimat during a media tour, Nov. 15, 2013. BC's Mobile Medical Unit (a portable emergency room) is seen in Kitimat during a media tour, Nov. 15, 2013. The Rio Tinto Alcan aluminum smelter is seen during a media tour of the Kitimat Modernization The Rio Tinto Alcan aluminum smelter is seen during a media tour of the Kitimat Modernization The Rio Tinto Alcan aluminum smelter is seen during a media tour of the Kitimat Modernization Project, March 4, 2014. New construction is seen at the Rio Tinto Alcan aluminum smeltersite in Kitimat,BC, Oct. 7, 2012, Rio Tinto Alcan is in the midst of a $3.3 billion upgrade of the smelter that was orginally built in the early 1950s. New construction is seen at the Rio Tinto Alcan aluminum smeltersite in Kitimat,BC, Oct. 7, 2012, Rio Tinto Alcan is in the midst of a $3.3 billion upgrade of the smelter that was orginally built in the early 1950s. Terrace-Kitimat Northwest Regional Airport, just outside Terrace, BC, is seen during a media tour March 28, 2013. An Air Canada Express-Jazz Bomardier Dash8-300 is seen in front of the terminal building, right. The airport administration and maintenance building is seen on the left. (Robin Rowland) An Air Canada Express-Jazz Bombardier Dash 8-300 is fueled and loaded at Terrace-Kitimat Northwest Regional Airport, just outside Terrace, BC, March 28, 2013. (Robin Rowland) An Air Canada Express-Jazz Bombardier Dash 8-300 takes off from Terrace-Kitimat Northwest Regional Airport, just outside Terrace, BC, March 28, 2013. (Robin Rowland) An Air Canada Express-Jazz Bombardier Dash 8-300 takes off from Terrace-Kitimat Northwest Regional Airport, just outside Terrace, BC, March 28, 2013. (Robin Rowland) « ‹ of 2 › »